- Home
- Key Project Highlights
Capital Improvement Project
Page Navigation
Key Project Highlights
-
Fine Arts
We are looking to improve upon our music and art offerings by addressing the outdated back-stage lighting and sound (both buildings) and upgrading our music and art suites at the Jr./Sr. High.
STEAM
We also are looking to expand our STEAM (Science, Technology, Engineering, Art, and Math) programs from Pre-K – grade 12.
- The Elementary building will be renovating existing space to add a STEAM makerspace, an outdoor classroom, and a new technology classroom.
- The Jr./Sr. High building will be updating our existing technology (woodshop), along with renovating existing space to allow us to offer new courses such as welding, small engine repair, and metal working.
- We are proposing the addition of a new STEAM Innovation Center that will be utilized by the faculty and students to conduct STEAMrelated projects such as coding and robotics. This addition would also support the highly successful WEE (Wolverine Environmental Education) agricultural center, and include an attached greenhouse for year-round learning.
View the rendering of the proposed Jr/Sr High STEAM addition
Athletics
Finally, we will be addressing our athletic fields at both Richburg and Bolivar campus, which will include the replacement of our current football AstroTurf with new AstroTurf.
Proposed STEAM Addition

-
Other Project Highlights
Boiler/HVAC upgrades
Roofing Upgrades
Locker Room Upgrades
Building
Roofing upgrades
Elementary Classroom storage upgrades
Maintenance Building Upgrades
-
3-D Virtual Tours of Select Locations
These virtual tours show some of the key spaces that we plan to renovate in the upcoming project.